Three Dimensional System Time


The house build in 12 days in concrete with thermo acoustic insulation suitable for category /seismic areas.

It is not a prefabricated house, but a house built in concrete with 8 – 14 cm. thick walls, with external wall a load bearing structure up to the third floor. Construction period is in 12 days. This is achieved by leaving out two principal elements that require the most technical time i.c, column, beams, and block work in fill.